Installation Instructions

Congratulations on your new mantle shelf, window valance, or corner shelf. Now that you're excited and you've gotten it unpacked your ready to install it. Good Luck!

Parts Included With Kit:

  1. One shelf or valance

  2. One mounting strip *Two with corner shelf

  3. One hardware kit

Hardware Kit Included:

  1. 2- 2 1/2" screws per mounting strip

Tools And Supplies Needed:

  1. Level

  2. Electric drill with # 2 phillips bit

  3. Pencil

  4. Construction adhesive

Step 1
Using a level, position the product on the wall at your desired location.

Step 2
Draw a pencil line along the top edge of the product.

Step 3
Remove the product. Locate the studs in the wall. Place the mounting board 1/4" below the pencil line. Use pre-drilled counter-sink holes (the holes are 16" apart on the center when applicable) to screw mounting board to the studs in the wall.
NOTE:Product must be attatched to two studs in the wall. For our smaller products at least one stud is required. Failure to do this could result in serious injury. For a more secure support, construction adhesive can be placed on the back edge of mounting board attaching it to the wall.

Step 4
Place product on wall so the mounting strip bevel matches up with the opposite product bevel (see illustration below).

Note: If you have any installation problems please feel free to Contact Us.




Woodline Manufacturing - Designs By Ami
Home Decor Plant
1013 Highway 53
Eveleth, MN
Phone- (218) 744-5966
Fax - (218) 744-5969
E-Mail- DesignsByAmi@Woodlinemfg.com